3.1
|
Box Structure
|
Integrated (left/right/front/rear) frame structure, welded with national standard channel steel. The equipment is sturdy and durable, with small operation vibration and low noise, while ensuring the overall reliability and safety performance of the equipment.
|
3.2
|
Inner Box Material
|
Made of 1.0mm thick SUS #304 stainless steel; overall full welding treatment to ensure the sealing performance of the inner box. The bottom is strengthened for a load-bearing capacity of ≥300KG average load.
|
3.3
|
Outer Box Material
|
Made of cold-rolled steel plate with a thickness of 1.2MM, double-sided spraying treatment, and the color is blue-white. (Customizable according to customer requirements, providing color boards or color numbers)
|
3.4
|
Thermal Insulation Material
|
The thickness of the thermal insulation layer is 100MM, using fire-resistant high-strength rigid polyurethane foam thermal insulation material, with a thermal insulation coefficient of less than 0.0212 kcal/m∙hr.
|
3.5
|
Box Door Structure
|
Single-door design. A double-layer silicone rubber sealing strip is used between the door and the box, which is resistant to high and low temperatures and anti-aging to ensure sealing performance. The door frame and door edge are equipped with anti-condensation and anti-frost electric heating devices to avoid condensate on the box surface.
|
3.6
|
Test Observation Window
|
Equipped with 1 vacuum multi-layer explosion-proof glass viewing window, designed with anti-fog and anti-frost functions: the 四周 (surrounding) of the viewing window uses film coating heating for anti-frosting to prevent water vapor condensation; a safe high-brightness energy-saving lighting lamp is set above the observation window (can be manually controlled by a direct switch).
|
3.7
|
Air Path Components
|
Adopts a circulating fan and motor, aluminum extended shaft, and a high and low temperature-resistant aluminum multi-wing circulating fan structure to achieve forced convection vertical diffusion circulation. Adjustable air outlet for the air inlet.
|
3.8
|
Sample Shelf
|
Made of stainless steel, equipped with 2 sets of brackets, which can be freely adjusted up and down (customizable according to customer requirements).
|
3.9
|
Test Hole
|
Reserve 1 test hole with a diameter of 50mm on the left side of the box, and additionally deliver 1 set of silicone plug + sealing cover.
|
3.10
|
Three-Color Light
|
Install a three-color light: green for operation, yellow for stop, and red for fault.
|
3.11
|
Drainage Trough
|
Drainage troughs are provided around the box to facilitate the discharge of condensate and avoid internal water accumulation.
|
3.12
|
Balance Hole
|
A pressure balance hole is installed inside the box to balance the pressure inside and outside the box.
|
3.13
|
Universal Wheels
|
Universal wheels are installed at the bottom of the equipment to facilitate relocation, movement, and positioning of the equipment.
|